PCB Remediation at Lakes Regional high school in maine

Lakes Regional High School in Naples Maine was undergoing a major window replacement project where high levels of PCBs were found in the window caulking, adjacent masonry and soil.  Caulking and adjacent masonry needed to be removed under controlled conditions, with customized full containments constructed under negative air pressure.  The site characterization revealed the presence of mainly two types of PCB containing caulking on the exterior of the windows and doors at the school.  One was an intact, soft, gray caulking with concentrations between 37,000 and 46,000 ppm and the second was an intact, hard, brown caulking with concentrations of 900 ppm.   As a result of these findings, Dec-Tam was retained to remove and dispose of exterior asbestos containing “transite” panels associated with the windows, all affected caulking and adjacent:

All building materials were removed within containment to 7 inches from caulking locations where PCB concentration levels were reduced to levels < 1ppm.  Additionally, asphalt pavement and soil 24 inches deep and 24 inches away from the building were removed.

 Some noteworthy aspects of this project were:

Andy Madura, Director of Transportation, Facilities & Food Services SAD #61 had this to say about the project.  "We were very impressed with DEC-TAM.  Their staff was very professional and did an excellence job for us. Working while students were in the building caused quite a challenge, but DEC-TAM stepped up and did their work with little to no interruptions for staff and students."

< back

Project Highlights

Customer
Public High School - Naples Maine

Type
PCB Remediation

Project Value

$300,000

Project Summary
Remediated PCB Containing Caulking and associated masonry in conjunction with a window replacement project.  Removed/Disposed of PCB Contaminated Soils due to leaching in certain areas. 


Lakes-Regional-High-School-Maine

13 images

Two Story Containment Up Close
7 Inch Cut Border Around Window
Working around Window Opening
Exterior of Full Containment
Tools Used
Dust Control
Wall Opening
Completed Window Area
Waste Loadout
Removing Debris
Dec-Tam Supports the Lakers
Three Areas in Containment
Full Containment
 

DEC-TAM CORPORATION
50 Concord Street | North Reading, MA 01864-2602 | 978.470.2860
Copyright 2011 Dec-Tam Corporation. All rights reserved. | Privacy Policy | Sitemap
Website Design and Search Engine Optimization by Discovery Communications Group.